{"id":133131,"date":"2022-06-03T09:56:15","date_gmt":"2022-06-03T09:56:15","guid":{"rendered":"https:\/\/swissfederalism.ch\/progetto-innovativo-logistica-sottoterra\/"},"modified":"2022-06-03T10:07:04","modified_gmt":"2022-06-03T10:07:04","slug":"switzerland-innovative-underground-logistics-project-takes-shape","status":"publish","type":"post","link":"https:\/\/swissfederalism.ch\/en\/switzerland-innovative-underground-logistics-project-takes-shape\/","title":{"rendered":"Switzerland&#8217;s innovative underground logistics project takes shape"},"content":{"rendered":"<h1 class=\"text-center\"><span class=\"font-377884\">Switzerland&#8217;s innovative underground logistics project takes shape<\/span><\/h1>\n<h3><span class=\"font-377884\"><em>Cargo sous terrain (CST) has reached the first milestones to develop the entire Swiss network, which is expected to be ready by 2045 in cooperation with cities and cantons while the first section from H\u00e4rkingen to Zurich Airport will open in 2031.<\/em><\/span><\/h3>\n<h3><\/h3>\n<figure id=\"attachment_133098\" aria-describedby=\"caption-attachment-133098\" style=\"width: 1140px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/swissfederalism.ch\/progetto-innovativo-logistica-sottoterra\/cst-cms\/\" rel=\"attachment wp-att-133098\"><img decoding=\"async\" class=\"wp-image-133099 size-full\" src=\"https:\/\/swissfederalism.ch\/wp-content\/uploads\/2022\/06\/CST-CMS.jpg\" alt=\"Cargo sous terrain (CST) unterirdischen Logistiksystems in der Schweiz @ CST \" width=\"1140\" height=\"390\" srcset=\"https:\/\/swissfederalism.ch\/wp-content\/uploads\/2022\/06\/CST-CMS.jpg 1140w, https:\/\/swissfederalism.ch\/wp-content\/uploads\/2022\/06\/CST-CMS-300x103.jpg 300w, https:\/\/swissfederalism.ch\/wp-content\/uploads\/2022\/06\/CST-CMS-1024x350.jpg 1024w, https:\/\/swissfederalism.ch\/wp-content\/uploads\/2022\/06\/CST-CMS-768x263.jpg 768w\" sizes=\"(max-width: 1140px) 100vw, 1140px\" \/><\/a><figcaption id=\"caption-attachment-133098\" class=\"wp-caption-text\"><span class=\"font-377884\">Cargo sous terrain (CST) Underground logistics system in Switzerland @ CST<\/span><\/figcaption><\/figure>\n<p><span class=\"font-377884\">With the positive parliamentary decision at the end of 2021, investor funds for the CST have become available for the construction authorization phase, which includes preparing the necessary approval procedures in the cantons along the first section of the tunnel. In the cantons of Aargau, Solothurn and Zurich, the procedures for the structural plan, which are the prerequisite for the CST, will begin at the end of 2022. At the current stage, the most suitable locations for the hubs along the first section from <strong>H\u00e4rkingen to Zurich Airport<\/strong> are being studied, examining traffic accessibility and carrying out geological clarifications with the aim of integrating the hub into the landscape and inhabited area. This innovative profect will go a long way toward reducing the volume of surface freight traffic. Parallel to the planning of the first section, the CST is also working on the extension of the entire Swiss network by 2045.<\/span><\/p>\n<h2><span class=\"font-377884\">Eastern Switzerland wants a fast connection to the CST<\/span><\/h2>\n<p><span class=\"font-377884\">The study conducted by CST together with the cantons of St. Gallen and Thurgau of the feasibility potential of underground freight transport between Zurich and eastern Switzerland showed that extending the network to St. Gallen is technically and economically promising. Based on the results, more in-depth investigations of possible hub locations are now being conducted, and both cantons are working to develop the fastest possible connection to the future-oriented system.<\/span><\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_133102\" aria-describedby=\"caption-attachment-133102\" style=\"width: 818px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/swissfederalism.ch\/progetto-innovativo-logistica-sottoterra\/3d_simulation_5_gesamtsystem\/\" rel=\"attachment wp-att-133102\"><img decoding=\"async\" class=\"size-full wp-image-133103\" src=\"https:\/\/swissfederalism.ch\/wp-content\/uploads\/2022\/06\/3D_Simulation_5_Gesamtsystem.jpg\" alt=\"3D_Simulation_5_Gesamtsystem @CST\" width=\"818\" height=\"460\" srcset=\"https:\/\/swissfederalism.ch\/wp-content\/uploads\/2022\/06\/3D_Simulation_5_Gesamtsystem.jpg 818w, https:\/\/swissfederalism.ch\/wp-content\/uploads\/2022\/06\/3D_Simulation_5_Gesamtsystem-300x169.jpg 300w, https:\/\/swissfederalism.ch\/wp-content\/uploads\/2022\/06\/3D_Simulation_5_Gesamtsystem-768x432.jpg 768w\" sizes=\"(max-width: 818px) 100vw, 818px\" \/><\/a><figcaption id=\"caption-attachment-133102\" class=\"wp-caption-text\"><span class=\"font-377884\">3D simulation of the project @CST<\/span><\/figcaption><\/figure>\n<p><span class=\"font-377884\">In the joint study, projected freight volumes were determined and possible areas for a surface connection point were defined while also taking into consideration major regional development projects. The analyses show that the freight volumes in <strong>Frauenfeld, Weinfelden, Wil, Uzwil, Gossau Ost, St. Gallen <\/strong>and <strong>St. Margrethen<\/strong> would in principle justify the construction of a connection point. With this project, surface freight traffic can be moved underground, reducing pressure on infrastructure expansion.<\/span><\/p>\n<h2><span class=\"font-377884\">Technical Data<\/span><\/h2>\n<p><span class=\"font-377884\">The tunnel for the innovative logistics system will have a depth of 50 to 80 meters. Examination of technical feasibility included identification of possible conflicts with groundwater deposits and investigation of rock type. Both are critical to the success of the tunnel where it was found that groundwater areas can be largely undercut and thus any compromise of groundwater by the tunnel can be avoided. Between Winterthur and St. Gallen, specialists foresee geological conditions suitable for tunnel construction while between the east of the city of St. Gallen and the Rhine Valley, the subsurface is more challenging since this is already a peripheral area of the Alps.<\/span><\/p>\n<h2><span class=\"font-377884\">Economic potential<\/span><\/h2>\n<p><span class=\"font-377884\">The extension of the network to Frauenfeld, Wil, Uzwil, Gossau, and St. Gallen has economic investment potential while the extension of the tunnel to the Rhine valley involves high construction costs, which probably cannot be sufficiently covered by the freight potentials to be developed in the Rhine valley of St. Gallen and Vorarlberg. The connection to Weinfelden also appears uneconomic at present.<\/span><\/p>\n<p><span class=\"font-377884\"><strong><a href=\"https:\/\/swissfederalism.ch\/en\/in-switzerland-the-transport-of-goods-will-slide-underground\/\">In Switzerland the transport of goods will &#8220;slide&#8221; underground<\/a><\/strong><\/span><\/p>\n<p>&nbsp;<\/p>\n<p><iframe title=\"Cargo sous terrain - Erkl\u00e4rung System\" width=\"840\" height=\"473\" src=\"https:\/\/www.youtube.com\/embed\/r11X-zMF_pc?feature=oembed&#038;width=840&#038;height=1000&#038;discover=1\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen><\/iframe><\/p>\n<h2><span class=\"font-377884\">Promising potential in French-speaking Switzerland<\/span><\/h2>\n<p><span class=\"font-377884\">A feasibility study in cooperation with the cantons of Vaud and Geneva also confirmed the economic viability of a connection to the comprehensive CST network in French-speaking Switzerland. The partial shift of road freight traffic underground also brings significant ecological benefits to Lake Geneva. The overall result is improved quality of life and public health in the region.\u00a0<\/span><\/p>\n<p>&nbsp;<\/p>\n<h2><\/h2>\n<p><a href=\"https:\/\/swissfederalism.ch\/infografica-della-sezione-verticale-di-uno-dei-tunnel-di-collegamento-di-cargo-sous-terrai\/\"><img decoding=\"async\" class=\"size-large wp-image-104327\" src=\"https:\/\/swissfederalism.ch\/wp-content\/uploads\/2021\/06\/Infografica-della-sezione-verticale-di-uno-dei-tunnel-di-collegamento-di-Cargo-Sous-Terrai-1024x683.jpeg\" alt=\"Infografica della sezione verticale di uno dei tunnel di collegamento di Cargo Sous Terrain in Svizzera\" width=\"840\" height=\"560\" srcset=\"https:\/\/swissfederalism.ch\/wp-content\/uploads\/2021\/06\/Infografica-della-sezione-verticale-di-uno-dei-tunnel-di-collegamento-di-Cargo-Sous-Terrai-1024x683.jpeg 1024w, https:\/\/swissfederalism.ch\/wp-content\/uploads\/2021\/06\/Infografica-della-sezione-verticale-di-uno-dei-tunnel-di-collegamento-di-Cargo-Sous-Terrai-300x200.jpeg 300w, https:\/\/swissfederalism.ch\/wp-content\/uploads\/2021\/06\/Infografica-della-sezione-verticale-di-uno-dei-tunnel-di-collegamento-di-Cargo-Sous-Terrai-768x512.jpeg 768w, https:\/\/swissfederalism.ch\/wp-content\/uploads\/2021\/06\/Infografica-della-sezione-verticale-di-uno-dei-tunnel-di-collegamento-di-Cargo-Sous-Terrai-1536x1024.jpeg 1536w, https:\/\/swissfederalism.ch\/wp-content\/uploads\/2021\/06\/Infografica-della-sezione-verticale-di-uno-dei-tunnel-di-collegamento-di-Cargo-Sous-Terrai.jpeg 1920w\" sizes=\"(max-width: 840px) 100vw, 840px\" \/><\/a><\/p>\n<p><span class=\"font-377884\">Infographic of the vertical section of one of Cargo Sous Terrain&#8217;s connecting tunnels in Switzerland<\/span><\/p>\n<h2><span class=\"font-377884\">Zurich: traffic reduction in the city and airport<\/span><\/h2>\n<p><span class=\"font-377884\">A few days ago, CST AG signed a &#8220;<em>Memorandum of Understanding<\/em>&#8221; with Flughafen Z\u00fcrich AG (FZAG), which has held a stake in CST since 2019 to connect the airport with the first section in order to relieve access roads while controlling logistics flows. In terms of construction, this will be accomplished with a branch of the main tunnel: CST is providing the tunnel and vertical conveyors, while FZAG builds the actual logistics terminal building.<\/span><\/p>\n<h2><span class=\"font-377884\">Sal\u00fcBox\u00a0<\/span><\/h2>\n<p><span class=\"font-377884\">In the city of Zurich, CST is supporting municipal authorities in a pilot parcel storage and collection project called &#8220;Sal\u00fcBox&#8221; intended to bundle the booming parcel delivery traffic and relieve residential neighborhoods of delivery traffic. Local businesses and merchants will also be able to use the <strong>Sal\u00fcBox<\/strong> to deposit goods. This partnership is part of CST-Citylogistik&#8217;s efforts to reduce urban traffic and pollutant emissions even before the tunnel goes into operation, improving everyone&#8217;s quality of life, and in four parts of the city area it is expected to start in the fall.<\/span><\/p>\n<h2><span class=\"font-377884\">Network<\/span><\/h2>\n<p><span class=\"font-377884\">The first section of the Cargo sous terrain network runs from <strong>H\u00e4rkingen-Niederbipp to Zurich<\/strong> and is about 70 kilometers long. There are 10 connection points (hubs) on this section. Expansion to other major logistics and distribution centers in Switzerland will take place later and by 2045, a 500-kilometer network will be created between Lake Constance and Lake Geneva, with branches to Basel, Lucerne and Thun. Total costs for the construction of the first section from H\u00e4rkingen-Niederbipp to Zurich, including software, hubs and underground and ground vehicles (for urban logistics) are estimated at 3 billion francs.<\/span><\/p>\n<figure id=\"attachment_104318\" aria-describedby=\"caption-attachment-104318\" style=\"width: 840px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/swissfederalism.ch\/in-svizzera-il-trasporto-delle-merci-scivolera-sotto-terra\/infografica-completa-dei-collegamenti-di-cargo-sous-terrain-in-svizzera-con-il-tratto-iniziale-da-da-harkingen-niederbipp-a-zurigo-in-rosso\/\" rel=\"attachment wp-att-104318\"><img decoding=\"async\" class=\"size-large wp-image-104319\" src=\"https:\/\/swissfederalism.ch\/wp-content\/uploads\/2021\/06\/Infografica-completa-dei-collegamenti-di-Cargo-Sous-Terrain-in-Svizzera-con-il-tratto-iniziale-da-da-Harkingen-Niederbipp-a-Zurigo-in-rosso-1024x683.png\" alt=\"Infografica completa dei collegamenti di Cargo Sous Terrain in Svizzera, con il tratto iniziale fra H\u00e4rkingen-Niederbipp e Zurigo in colore arancione\" width=\"840\" height=\"560\" srcset=\"https:\/\/swissfederalism.ch\/wp-content\/uploads\/2021\/06\/Infografica-completa-dei-collegamenti-di-Cargo-Sous-Terrain-in-Svizzera-con-il-tratto-iniziale-da-da-Harkingen-Niederbipp-a-Zurigo-in-rosso-1024x683.png 1024w, https:\/\/swissfederalism.ch\/wp-content\/uploads\/2021\/06\/Infografica-completa-dei-collegamenti-di-Cargo-Sous-Terrain-in-Svizzera-con-il-tratto-iniziale-da-da-Harkingen-Niederbipp-a-Zurigo-in-rosso-300x200.png 300w, https:\/\/swissfederalism.ch\/wp-content\/uploads\/2021\/06\/Infografica-completa-dei-collegamenti-di-Cargo-Sous-Terrain-in-Svizzera-con-il-tratto-iniziale-da-da-Harkingen-Niederbipp-a-Zurigo-in-rosso-768x512.png 768w, https:\/\/swissfederalism.ch\/wp-content\/uploads\/2021\/06\/Infografica-completa-dei-collegamenti-di-Cargo-Sous-Terrain-in-Svizzera-con-il-tratto-iniziale-da-da-Harkingen-Niederbipp-a-Zurigo-in-rosso-1536x1024.png 1536w, https:\/\/swissfederalism.ch\/wp-content\/uploads\/2021\/06\/Infografica-completa-dei-collegamenti-di-Cargo-Sous-Terrain-in-Svizzera-con-il-tratto-iniziale-da-da-Harkingen-Niederbipp-a-Zurigo-in-rosso.png 1920w\" sizes=\"(max-width: 840px) 100vw, 840px\" \/><\/a><figcaption id=\"caption-attachment-104318\" class=\"wp-caption-text\"><span class=\"font-377884\">Infographic of the 490 km of tunnels planned by 2045 to transport freight in Switzerland from east to west by Cargo Sous Terrain in Switzerland, with the initial section between H\u00e4rkingen-Niederbipp and Zurich in orange\u00a0 @CST<\/span><\/figcaption><\/figure>\n<p><span class=\"font-377884\">Fonte: cst.ch<\/span><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cargo sous terrain (CST) has reached the first milestones to develop the entire Swiss network, which is expected to be ready by 2045 in cooperation with cities and cantons while the first section from H\u00e4rkingen to Zurich Airport will open in 2031.<\/p>\n","protected":false},"author":9,"featured_media":104319,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[256,1698,260,210,257,1999],"tags":[2018,1667,795,1799,815,263,962,2015,2011,264],"class_list":["post-133131","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-economy","category-environment","category-highlights","category-magazine","category-switzerland","category-technology","tag-cargo-sous-terrain-cst-en","tag-co2-neutrales-en","tag-economy","tag-efficiency","tag-environment","tag-future","tag-innovation","tag-life-quality","tag-logistics","tag-sustainability"],"_links":{"self":[{"href":"https:\/\/swissfederalism.ch\/en\/wp-json\/wp\/v2\/posts\/133131","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/swissfederalism.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/swissfederalism.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/swissfederalism.ch\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/swissfederalism.ch\/en\/wp-json\/wp\/v2\/comments?post=133131"}],"version-history":[{"count":2,"href":"https:\/\/swissfederalism.ch\/en\/wp-json\/wp\/v2\/posts\/133131\/revisions"}],"predecessor-version":[{"id":133133,"href":"https:\/\/swissfederalism.ch\/en\/wp-json\/wp\/v2\/posts\/133131\/revisions\/133133"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/swissfederalism.ch\/en\/wp-json\/wp\/v2\/media\/104319"}],"wp:attachment":[{"href":"https:\/\/swissfederalism.ch\/en\/wp-json\/wp\/v2\/media?parent=133131"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/swissfederalism.ch\/en\/wp-json\/wp\/v2\/categories?post=133131"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/swissfederalism.ch\/en\/wp-json\/wp\/v2\/tags?post=133131"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}